S.R. 0322 Section C01
Michael Kilgore
Cost: 18 Million
Project Length: 12-Miles
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)
(Roadway and Bridge Reconstruction) - This project included a Five Span (Overall span length 344-4) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0153 over S.R. 0080 (I-80); a single (49-8 1/2) Span Composite Prestressed Concrete Bridge carrying S.R. 0322 over Moose Creek; and a single (50-7 5/8) Span Composite Prestressed Concrete Bridge carrying S.R. 0322 over Moose Creek. It also included the reconstruction of a major Interchange between S.R. 0080 (I-80) with S.R. 0153.