S.R. 2025 Section 155
Michael Kilgore
Cost: $1.87 Million
Project Length: 0.317 Mile
Client: PennDOT Engineering District 10-0
Contact: Ms. Melanie Percha (724-357-4804)
Project Letting - 1999
(Garretts Run) - Roadway Reconstruction and Structure Replacement - This project consisted of reconstruction of a Major Collector facility and three (3) single span (51.5, 54.5, & 47.0 spans) Prestressed Concrete Spread Box Beam Bridges. Also included was the reconstruction of 0.07 mile of a Township Road.