Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R 0119, Section 461

Michael Kilgore

Cost: $3.2 Million
Client: PennDOT District 10-0
Contact: Mr. Jason Layman (724-357-7614)
Project Letting: 2014

Indiana County - This project consisted of dual bridge replacements carrying S.R. 0119 over SR 1002. The project also included 837 LF of approach roadway reconstruction on both northbound and southbound roadways. The replacement bridges are single span (100’ southbound; 120’ northbound) bridges supported by integral abutments. The replacement of each bridge was performed under phased construction.

S.R. 4010 Section 010

Michael Kilgore

Final

Before

Final

Final

Cost: $0.53 million
Client: PennDOT District 8-0
Contact: Mr. Ben Singer, P.E. (717-787-6690)
Project Letting: January 2016

Edenville Road Bridge - This project included a single span (41.4’ c/c brgs.) prestressed concrete spread box beam bridge with conventional abutments. The project also included 1,559’ of approach roadway construction.

S.R. 0982, Section N10

Michael Kilgore

After

Before

Before

After

Before

After

Project Cost: $3.96 Million
Client: Engineering District 12-0
Contact: Mr. Brian Svesnik (724-415-2400)
Project Letting: January 2015

Westmoreland County - This project included the phased total replacement of a deteriorated three span steel girder bridge with inadequate underclearance with a two span continuous P/S spread box beam bridge (168’ total length) with minimal profile grade adjustment. The bridge carries four lanes S.R. 0982 over four lanes S.R. 0030 and includes special barrier (formed words of local icons) and pier architectural treatments. The project also includes 2,400’ of approach roadway reconstruction and interchange ramp repairs.