Projects

SPK Engineering's past projects

Filtering by Category: District 12

S.R. 4099, Section EMR

Michael Kilgore

$2.204 million
Client: PennDOT District 12-0
Contact: Gary Ferrari (gferrari@pa.gov)
Construction Start: May 4, 2020
Construction finished: October 15th, 2020

East Vandergrift Emergency Slide - Westmoreland County - This project was the emergency stabilization of the steep S.R. 4099 roadway/sidewalk. The slope and sidewalk had been a recurring maintenance issue for many years. SPK along with EI prepared an emergency construction plan utilizing a 650’ long staggered dowel system developed by EI. The system is comprised of a drilled concrete-filled casing capped with a cast-in-place concrete cap which doubled as the new sidewalk. Due to the narrow roadway, traffic was detoured throughout the duration of construction. Also, due to the emergency nature of the project, the contractor was immediately brought on board to collaborate on means and methods, material procurement, access, etc. The Advanced Notice to Proceed was issued March 13, 2020 and the Final PS&E was developed April, 29, 2020. The project is completed and was opened back up to traffic on October 15th, 2020.

S.R. 2030 Section F10

Michael Kilgore

A66A1111Bs.jpg
A66A1136Bs.jpg

Project Cost: $1.1 Million
Client: PennDOT Engineering District 12-0
Contact: Mr. James Sisul (724-439-7379)
Project Letting: March 2019
Construction Completed: October 2019

SR 2030, Section F10 (California Drive over Gorby Run) – This project involved the replacement of the existing single span steel girder bridge with the new precast reinforced concrete rigid frame. Roadway geometry has now been improved along with intersection re-alignment at SR 2030 and North California Drive. Additionally, intersection sight distance within the project area has been improved. Traffic was maintained throughout construction via detour. 

S.R. 3013, Section J30

Michael Kilgore

After

After

Before

Before

Cost: $208.912
Client: PennDOT District 12-0
Contact: Jeremy Hughes (724-415-1025)
Project Letting: April 2015

Retaining Wall Replacement - Fayette County - This project involved the expedited replacement of a failing concrete retaining wall. Three options, including a conventional cast-in-place concrete cantilever wall with a spread footing, a steel pile and precast concrete lagging wall, and a hybrid steel pile and cast-in-place integrated wall, were designed for bidding purposes. The initial contact from the District was April 2, 2015. SPK delivered the final plans, including a construction plan for the roadway reconstruction, a traffic control plan, and the structure plans, on April 23, 2015, 21 days after the initial contact.