S.R. 3013, Section J30
Michael Kilgore
Cost: $208.912
Client: PennDOT District 12-0
Contact: Jeremy Hughes (724-415-1025)
Project Letting: April 2015
Retaining Wall Replacement - Fayette County - This project involved the expedited replacement of a failing concrete retaining wall. Three options, including a conventional cast-in-place concrete cantilever wall with a spread footing, a steel pile and precast concrete lagging wall, and a hybrid steel pile and cast-in-place integrated wall, were designed for bidding purposes. The initial contact from the District was April 2, 2015. SPK delivered the final plans, including a construction plan for the roadway reconstruction, a traffic control plan, and the structure plans, on April 23, 2015, 21 days after the initial contact.