S.R. 2023 Section H00
Michael Kilgore
Cost: $1.5 million
Client: PennDOT Engineering District 12-0
Contact: Mr. Jerry Bendo (Retired)
Pigeon Creek Bridge Replacement - This project included a two span (125.32' overall span) prestressed concrete spread box beam bridge over Pigeon Creek. The project also includes was 1,225' of approach roadway reconstruction.