S.R. 0188 Section B10
Michael Kilgore
Cost: $1.2 Million
Project Length - 10 Miles
Client: PennDOT Engineering District 12-0
Bridge Replacement - This project included a Two-Span (Overall span length - 125') Continuous
Composite Prestressed Concrete Bridge carrying S.R. 0188 over the South Fork of Tenmile Creek.