Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: S.R. 3026 Section B02

S.R. 3026 Section B02

Michael Kilgore

Project Cost: $1.3 million
Client: Allison Park Contractors, Inc. / Engineering District 11-0
Contact: Ms. Cheryl Solosky, P.E.
Project Letting – November 2016

Beaver County- The project consists of the replacement of the existing single span steel I-beam bridge carrying SR 3026 (Gas Valley Road) over Branch of South Fork of Tomlinson Run with a precast concrete box culvert.   Minor approach roadway work was also part of the design-build contract.