S.R. 2005 Section UNK
Michael Kilgore
Project Cost: $1.3 Million
Client: Cumberland Coal Resources, LP
in cooperation with PennDOT Engineering District 12-0
Contact: Mr. Patrick Richter (724-430-4499)
Project Letting - 2011
Greene County - This project was the replacement of an existing arch structure carrying S.R. 2005 (Polecat Hollow Road) over a railroad spur for Cumberland Coal Resources, LP (CCR) which was damaged due to mine subsidence. SPK was retained by CCR to perform the replacement studies and final construction plans. The design was coordinated with PennDOT District 12-0 since it is a state-owned facility. The replacement structure was a precast concrete arch structure (28’ clear span) with precast wingwalls and spandrel walls (ConSpan product). The design and fabrication was coordinated with ConTech Solutions, for an efficient construction process. The project also included 440 LF of roadway reconstruction.