Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Mercer

S.R. 2005, Section B00

Michael Kilgore

Project Cost:  $2.7 million
Client: PennDOT District 1-0
Contact: Mr. Steven Schettler (814-678-7356)
Project Letting - 2014
 
Mercer County -  Bridge Replacement - The project consists of a new replacement single span (142.5’ span), steel plate girder bridge to carry Irishtown Road (S.R. 2005) over the Bessemer & Lake Erie Railroad (B&LE) Railroad in Pine Township. The proposed structure presented vertical profile challenges requiring railroad clearance and roadway tie-ins to at-grade intersections on each side of the structure. The project utilizes a local detour route in coordination with local officials and emergency responders. Additional design considerations included railroad coordination and clearance, overhead utility relocations and waterway permitting requirements.

S.R. 0018 Section A01

Michael Kilgore

Cost: $11.8 Million
Project Length:2.73 Miles
Client: Engineering District 1-0
Contact: Ms. Jeanette Uhl, P.E. 814-678-7084

This project consisted of widening S.R. 0018 (North Hermitage Road) from two lanes to five lanes. Five signalized intersections were upgraded and one new traffic signal installed at Shenango Valley Mall/Hermitage Middle School entrance.