Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Feasibility Study

S.R. 0068, Section B18

Michael Kilgore

Project Cost:  $2 Million
Project Length: 1.32 Miles
Client: Engineering District 11-0
Contact: Mr. Robert Slagel, P.E. (412-429-4926)

Vanport Borough Traffic Study (Preliminary Design)  - Beaver County - This project consisted of preliminary engineering and preparation of a Feasibility Study to determine an alternative to alleviate traffic congestion.  The total project length was 1.32 miles.