S.R. 0068, Section B18
Michael Kilgore
Project Cost: $2 Million
Project Length: 1.32 Miles
Client: Engineering District 11-0
Contact: Mr. Robert Slagel, P.E. (412-429-4926)
Vanport Borough Traffic Study (Preliminary Design) - Beaver County - This project consisted of preliminary engineering and preparation of a Feasibility Study to determine an alternative to alleviate traffic congestion. The total project length was 1.32 miles.