S.R. 0040 Section L10
Michael Kilgore
Cost: $0.9 million
Client: Engineering District 12-0
Contact: Mr. Barry Lyons, P.E. (724-439-7336)
Project Letting: 2009
Buffalo Creek Bridge Replacement - This project consisted of replacing the single span concrete T-Beam bridge with a single span 22’ precast concrete spread box beam bridge over Buffalo Creek. This project was immediately adjacent to a sensitive historic structure and included aesthetic treatments as mitigation.