Projects

SPK Engineering's past projects

S.R. 0981, Section SIG

Michael Kilgore

IMG_0755_stitchBs.jpg
IMG_0712.jpg
IMG_0731.jpg
IMG_0736.jpg
IMG_0688.jpg
IMG_0698.jpg

Cost: $3.47 million
Client: PennDOT District 12-0
Contact: Brian Svesnik (724-415-2400)
Project Letting: October 2019

Roadway Improvement - Westmoreland County - This project was for the replacement of nine existing traffic signals and the upgrade of an additional traffic signal located along S.R. 0981 and Ligonier Streets in the City of Latrobe.  This project also included the upgrade of all intersection to accommodate ADA. S.R. 0981 and Ligonier Street  were also milled and overlaid.

 

TR-466 (East Spring Road) Over Carr Run

Michael Kilgore

Before

Before

BIMG_0476.jpg

After

BIMG_0487.jpg

$416,939
Client: PennDOT District 1-0
Contact: Tom McClelland, P.E. (814-678-7081)
Project Letting: December 2019

Bridge Replacement - Crawford County - Spring Township - The project involved the replacement of an existing single span concrete encased steel I-beam bridge carrying T-466 (East Spring Road) over Carr Run with a single span prestressed concrete spread box beam bridge (44-0” span). The bridge foundations consisted of integral-type abutments supported by steel piles driven to refusal. The project also included 272’ of approach roadway work.

SR 3015 Section 01B

Michael Kilgore

Resized_20201120_085421.jpeg
Resized_20201120_101057.jpeg
Resized_20201120_100748.jpeg

ECMS No. 22635
Cost: $1.916 million
Client: PennDOT Engineering District 9-0
Contact: Mr. Raymond J. Seese III, P.E. (814-696-6821), raseese@pa.gov
Project Letting: April 9, 2020

 

The project consisted of an alignment shift of SR 3105 including 525’ of roadway reconstruction and replacement of an existing structure with a 66’ span fabricated steel plate girder bridge.