Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0997 Section 026

Michael Kilgore

IMG_0717B.jpg
After

After

Before

Before

IMG_0726.JPG

Project Cost: $1.8 million
Client: PennDOT District 8-0
Contact: Benjamin Singer, P.E. (717-787-6690)
Project Letting - May 2017
Construction completed October 2018

The project consisted of replacing the existing two-span Concrete T-Beam Bridge that carries S.R. 0997 over Conodoguinet Creek with a new single span Composite Steel Plate Girder Bridge on integral abutments.  Roadway approach work was included for approximately 300 feet on the southern approach and 500 feet on the northern approach.  The design maintained existing horizontal alignment, while the vertical alignment was slightly adjusted to allow for adequate clearance over Conodoguinet Creek. Traffic control consisted of phased construction, two-way traffic maintained by a single lane using temporary traffic signals.

Back

S.R. 0522 Section 16B

Michael Kilgore

After

After

Before

After

Project Cost: $441,301
Client: PennDOT District 9-0
Contact: Jacklyn Himmelwright (814-696-7171)
Project Letting: January 2018
Contractor: Wen-Brooke Contracting, Inc.

This project includes the replacement of an existing slab bridge carrying S.R. 0522 over Tributary to Big Cove Creek. After reviewing the site constraints, including utilities, buildings, and a billboard, and the difficulties associated with phasing the replacement, SPK, in conjunction with PennDOT, decided to advance an Accelerated Bridge Construction (ABC) option. This option included a  weekend detour of the 2,500 ADT, facilitated through the extensive use of precast components. Early communication with area businesses was critical in securing buy-in for this ABC approach. 

Back

S.R. 1012 Section B02

Michael Kilgore

After

After

After

Before

After

After

After

After

Cost $2.94 million
Client: PennDOT District 1-0
Contact: Mr. Stephen Schettler (814-678-7356)
Project Letting - March 2017

Russell Bridge Replacement - This project included the replacement of the single span through-truss carrying S.R. 1012 over Conewango Creek with a two-span (219’-4” overall span) prestressed concrete bulb-tee bridge. The bridge detailing included a sidewalk with a precast concrete overlook at midspan. Portions of the original cut stone abutments were maintained and the architectural surface treatment pattern was specified to match the original stone. The project also included 970’ of approach roadway construction.