Projects

SPK Engineering's past projects

Filtering by Category: District 12

S.R. 0070, Section 10A

Michael Kilgore

Cost: $5.45 Million
Client: Gulisek Construction, LLC
Contact: Mr. Clayton Stahl (724-696-3341)
Project Letting: November 2009

Bridge Replacement - Washington County -  This project is a design-build bridge replacement project. The project included the removal of a single span bridge carrying Interstate 70 (I-70) eastbound and westbound over S.R. 2017 (Dunningsville Interchange). SPK prepared the final construction plans, traffic control plans, and structure plans for the contractor. Construction was completed in 2011.

 

S.R. 0021 Section 10D

Michael Kilgore

Greene County
$5.125 million
Client: PennDOT Engineering District 12-0
Contact: Mr. James Sisul (724-439-7379)
Project Letting: January 2016


This project included the reconstruction and realignment of two intersections and a new traffic signal. The project also included 2,165’ of roadway construction.

 

S.R. 0982, Section N10

Michael Kilgore

After

Before

Before

After

Before

After

Project Cost: $3.96 Million
Client: Engineering District 12-0
Contact: Mr. Brian Svesnik (724-415-2400)
Project Letting: January 2015

Westmoreland County - This project included the phased total replacement of a deteriorated three span steel girder bridge with inadequate underclearance with a two span continuous P/S spread box beam bridge (168’ total length) with minimal profile grade adjustment. The bridge carries four lanes S.R. 0982 over four lanes S.R. 0030 and includes special barrier (formed words of local icons) and pier architectural treatments. The project also includes 2,400’ of approach roadway reconstruction and interchange ramp repairs.