PTC WB-228
Michael Kilgore
Cost: $3.62 million
Client: PA Turnpike Commission
Contact: Ken Slippey, (717-939-9551x-5150)
Project Letting 2012
PTC WB-228 Bridge Replacement - This bridge replacement project carrying S.R. 0989 over the mainline PTC. The replacement structure is a two-span (177’-10 ½” overall span) precast concrete bulb-tee bridge, sized to accommodate the future widening of the PA Turnpike.