S.R. 0151 Section 016
Michael Kilgore
Cost: $1.96 million
Project Length: 324.19 feet
Client: Engineering District 11-0
Contact: Mr. Elwood Balog, P.E. (412-429-4877)
Bocktown Road Bridge Replacement - This project included a single span (116.52’ c/c brgs.) prestressed concrete adjacent box beam bridge over Raccoon Creek and a pile and plank retaining wall (207.67’). The bridge replacement design was coordinated with the approach roadway reconstruction design performed by Engineering District 11-0.