Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 1

S.R. 0019 Section A01/A02

Michael Kilgore

Cost: $3.6 million
Project Length: 1.35 Miles
Client: PennDOT Engineering District 1-0
(Peach Street) Roadway Improvements (5 Intersections) -This project consisted of widening S.R. 0019 to accommodate a fifth center turning lane. It was located in a highly commercialized congested area. The project also included the design of a coordinated signal system (Six 6 signals). 

S.R. 0059 Section B02

Michael Kilgore

Cost: $2.6 Million
Project Length: 950 feet
Client: Engineering District 1-0

Devil’s Elbow Bridge Superstructure Replacement - This project included a Four-Span (Overall span length – 600’) Continuous Composite Steel Deck Girder Bridge carrying S.R. 0059 over Jakes Run. The entire length of the project was 950 feet.