S.R. 0090 Section A05
Michael Kilgore
Cost: $23.0 million
Project Length: 6 Miles
Client: PennDOT Engineering District 1-0
Contact: Mr. Bill Pettit, P.E. (814-678-7015)
I-4R Roadway and Bridge Reconstruction Project - This project included the reconstruction of a Diamond Interchange between S.R. 0090 with S.R. 0832 and a Full Cloverleaf Interchange between S.R. 0090 (I-90) with S.R. 0079 (I-79).