Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Culvert Replacement

S.R. 0160 Section 014

Michael Kilgore

Cost: $1.23 million
Project Length: 2,130'
Client: PennDOT Engineering District 9-0
Contact: Mr. Dave Wolfhope, P.E. (814-696-7196)

Two Culvert Replacements - This project included two precast concrete box culverts; 15'-0" x 10'-0" and 20'-0" x 12'-0" for S.R. 0160 over a Tributary to Boone Run and T.R. 542 over Boone Run respectively. The project also included roadway reconstruction lengths of 1,007' and 1,123' for S.R. 0160 and T.R. 542 respectively. 
 

S.R. 0036 Section 11S & 15B

Michael Kilgore

Cost: $1.2 million
Project Length: 2,475' (0.469 mile)
Client:Client: PennDOT Engineering District 9-0
Contact: Mr. Dave Wolfhope, P.E. (814-696-7196)

S.R. 0036, Sections 11S & 15B - Two (2) Culvert Replacements - This project included two (2) precast concrete box culverts; 10'-0" x 6'-6" and 10'-0" x 7'-6" for S.R. 0036, Section 11S over Dry Gap Run and S.R. 0036, Section 15B over a Tributary to Dry Gap Run respectively. The project also included a roadway reconstruction length of 2,595'.