Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Concrete spread box beam bridge

S.R. 4003 Section 003

Michael Kilgore

Before

After

Cost: $1.2 million
Client: PennDOT Engineering District 9-0
Project Manager - Mrs. Melissa Irwin, E.I.T. (814) 696-6858

Mill Run Bridge Replacement - This project consisted of a new replacement single span, concrete spread box beam bridge to carry Broad Avenue (S.R. 4003) over Mill Run in the City of Altoona. The bridge design and traffic control plan were prepared for half-width construction to maintain traffic. The design accounted for the close proximity of two (2) residences and a major signalized intersection adjacent to the ends of the bridge. Additional design considerations included utility coordination to maintain utility lines across the bridge, traffic signal pole foundations in the abutment, ADA ramp design and turn restriction related detours and phasing.