S.R. 0008, Section A03
Michael Kilgore
Project Cost: $6.5 million
Client: Engineering District 1-0
Contact: Mr. Rod Fasenmyer, (814-678-7369)
Project Letting February 2010
Venango County - SPK provided preliminary and final design engineering services for a 2.25 mile roadway realignment and widening project south of Titusville, PA. SPK developed a preliminary design which improved the horizontal and vertical alignment to meet current design speed criteria while minimizing cost and right-of-way impacts. The final design presented unique traffic control challenges of maintaining mainline traffic while constructing the roadway in half-widths. SPK completed a comprehensive right-of-way plan, utility coordination, integral abutment bridge design, drainage, E&S, stormwater, environmental permits and traffic control plan as part of the PS&E package. SPK worked closely with the District in coordinating public and emergency official involvement regarding the project schedule and access issues.