Congratulations to Eric Starliper!
Michael Kilgore
Congratulations to Eric Starliper! – November 2, 2022 - Voted as WV ASCE Young Member Forum Vice President!
Use the form on the right to contact us.
You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right.
123 Street Avenue, City Town, 99999
(123) 555-6789
email@address.com
You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.
SPK Engineering's past projects
Congratulations to Eric Starliper! – November 2, 2022 - Voted as WV ASCE Young Member Forum Vice President!
SPK’s Senior Project Manager Patrick Richter accepts the Second Place award: Small Bridge Category - WVDOH Nominated Crooked Creek Bridge Project in Mason County WV At the annual ACECWV Transportation Awards Banquet and Transportation Forum (October 19, 2022)
To see more information on this project go to:
www.spkengr.com/blog/2022/10/21/crooked-creek-bridge-cr-16-mason-county
Cost: $2.7 million
Client: WVDOH
Contact: Patrick Brennan, P.E. (304-414-6418)
Project Construction: Estimated 2023
CR 16 Crooked Creek Bridge - Mason County, WV - The proposed bridge replacement will be built to match the horizontal curvature of the new roadway alignment. The bridge will utilize a curved steel plate girder superstructure and will be supported by semi-integral abutments that will not be skewed (radial). The new bridge cross-section will provide two (2) 11’-0” travel lanes and two (2) 4'-0" shoulders, along with 32” tall Type F barriers. The bridge width will be 30'-0" curb-to-curb and the overall out-to-out will be 32'-6". New roadway will be constructed on both sides of the proposed structure to allow for a proper tie-in to the existing roadway. Approximately 350’ of roadway will be constructed to the west of the structure to tie-in at Station 28+50.00 and approximately 300’ of roadway will be constructed to the east of the structure to tie-in at Station 35+75.00.