Projects

SPK Engineering's past projects

S.R. 0449, Section A02

Michael Kilgore

After

Before

Before

after

after

after

 

Cost: $1.04 million
County: Potter County
Client: PennDOT District 2-0
Contact: Mr. Craig Sattesahn, P.E. (814-765-0678)
Project Letting: January 2015

This project is the replacement of an existing bridge carrying S.R. 0449 (North Brookland Road) over Pine Creek. The replacement structure is a precast concrete box culvert (18’ normal clear span). A temporary roadway and stream crossing are included in the project to maintain traffic during construction. The project also includes 587 LF of roadway reconstruction.

S.R. 3104 Section A02

Michael Kilgore

 Cost: $6.84 million
Client: Engineering District 11-0
Contact: Mr. Jeffrey Baker (412-429-4900)

McKees Rocks Bridge - This project included the rehabilitation of a 17 span (4,365’ overall) steel truss-arch bridge carrying S.R. 3104 over the Ohio River, CSX Railroad, and several local streets. The rehabilitation included concrete filled steel grid sidewalk replacement, deck joint replacement, zone painting, concrete repairs, and miscellaneous structure repairs.

 

S.R. 0065 Section A11

Michael Kilgore

Cost: $1.5 million
Client: Engineering District 11-0
Contact: Mr. John Alvetro (412) 429-5088

Ohio River Boulevard - Widening and Resurfacing - This project consisted of widening Ohio River Boulevard from 40’ to 52’ for use of a proposed center lane. The project also included a traffic signal upgrade as well as drainage and signing/pavement marking improvements. Critical design activities were maintaining access to businesses, utility relocation design, and construction schedule relative to utility on-site relocations.