Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 2

S.R. 0949 Section A01

Michael Kilgore

Cost: $1.14 million
Client: PennDOT District 2-0
Contact: Mark Kucherer, P.E. (814-765-0440, mkucherer@pa.gov)
Project Letting: March 4, 2021

S.R. 0949, Section A01 - Pipe Replacement - This project consists of the replacement of a deteriorated metal plate pipe arch carrying S.R. 0949 over Maxwell Run with a precast concrete box culvert. Traffic will be maintained via a temporary roadway constructed downstream of the existing structure. 250’ of approach roadway reconstruction is included.

S.R. 2004 Section A05

Michael Kilgore

Before

After

Clinton County
Cost: $920,180
Client: PennDOT District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)
Project Letting - September 2014

This project included a single span (87’ c/c brgs.) precast concrete adjacent box beam bridge with conventional cantilever abutments. The project also included 675’ of approach roadway reconstruction.

S.R. 0850, Section A03

Michael Kilgore

Cost: $321,704
Client: Engineering District 2-0
Contact: Mr. Steve Fantechi, P.E. (814-765-0677)
Project Letting - 2011

 Structure Replacement - Juniata County - This project included the replacement of an existing bridge with a precast concrete box culvert (span - 19’). The project also included 510’ of approach roadway reconstruction.