Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 11

S.R. 0030 Section A15

Michael Kilgore

Cost: $3.97 million
Client: Engineering District 11-0
Contact Mr. Jeffrey Baker (412-429-4900)
Project Letting - 2008

Westinghouse Bridge - This project included the rehabilitation of a five-span (1,524’ overall span) reinforced concrete open spandrel arch bridge carrying S.R. 0030 over Turtle Creek, Braddock Road, several tracks of Norfolk Southern and Union Railroad, and several local streets. The rehabilitation included deck joint replacement, bearing retrofits, concrete repairs, and miscellaneous structure repairs.

 

 

S.R. 0008 Section A40

Michael Kilgore



 Cost: $6.62 million
Client: Engineering District 11-0
Contact Mr. Michael Sokol (412-429-4898)
Project Letting - 2007

RD Fleming Bridge - This project included the rehabilitation of a 27 span (2,784’ overall) mixed steel deck truss/steel multi-girder bridge carrying SR 0008 over the Allegheny River, several tracks of the Pennsylvania Railroad, and several local streets. The rehabilitation included deck joint replacement, barrier reconstruction, concrete repairs, and miscellaneous structure repairs.

 

S.R. 0376 Section A39 & A40

Michael Kilgore

Cost: $43 Million
Client: Engineering District 11-0
Contact: Jeff Thompson, P.E., (412) 429-4929 and
Doug Seeley, P.E., (412) 429-4883

SPK developed roadway and bridge plans for a 4.5-mile rehabilitation section of the Parkway East (Churchill to PA Turnpike). The project included roadway plans, sixteen (16) structure plans, traffic control, ITS, lighting and other also plans and waterway permits. SPK performed additional services for the Department without supplement to incorporate work from five (5) projects developed by others and incorporated into the A39 and A40 plans. Our subconsultant, FE provided engineering services to complete the Transportation Management Plan, traffic engineering analysis and traffic control details.