S.R. 0322 Section 554

Michael Kilgore


Cost: $1.02 million
Client: PennDOT District 10-0
Contact: John McCombie, P.E. (724-357-2964)
Project Letting - August 2016


Arch Culvert Extension and Rehabilitation, This project consisted of the extension, both upstream and downstream, and rehabilitation of a reinforced concrete arch culvert (10’ span) carrying S.R. 0322 over a Tributary to Coder Run. Access and constructability were the primary challenges associated with this project. The scope of work also included 850’ of approach roadway reconstruction. 

 

Back

S.R. 1006, Section 450

Michael Kilgore

After

After

After

After

Cost: $3.04 million
Client: Engineering District 10-0
Contact: Mr. Jason Layman (724-357-7614)
Project Letting: August 2014

Indiana County - This project included the phased total replacement of a deteriorated four span steel girder bridge with inadequate underclearance with a two span continuous fabricated steel girder bridge (230’ total length) with minimal profile grade adjustment. The bridge carries S.R. 1006 (Airport Road) over four lanes of S.R. 0119. The project also included 370’ of approach roadway reconstruction.

S.R. 0119, Section 462

Michael Kilgore

After

After

Before

Before

After

After

After

After

Cost: $3.78 Million
Client: PennDOT District 10-0
Contact: Mr. Jason Layman (724-357-7614)
Project Letting: August 2015

Blais Bridges - Dual Bridge Superstructure Replacements - Indiana County -  This project consists of the replacement of the existing dual bridge superstructures with single span steel plate girder spans (97.5’ each). The replacements are facilitated via cross-overs to maintain the S.R. 0119 Limited Access Freeway (6,600 ADT), establishing the 4,500’ project limits.