S.R. 1017 Section 01S

Michael Kilgore

Cost: $700,000
Client: PennDOT Engineering District 1-0
Contact: Ms. Jeanette Uhl, P.E. 814-678-7084

Traffic Signal Design - This project included the construction, timing, and coordination of nine (9) traffic signals in the city of Warren downtown area. The design included a closed loop system, with computer hardware, decorative signal poles and arms, a pole foundation into a building basement under the sidewalk, and replacement of heated sidewalks. 

 

S.R. 0079 Section A06

Michael Kilgore

Cost: $26.3 million
Client: PennDOT Engineering District 1-0
Contact: Rod Fasenmyer - 814-678-7369

Meadville Interchange Reconstruction Project - Originally a teaming effort with the District 1-0 Design Unit performing the roadway design with the SPK team performing all the structure design activities, evolved into a roadway design-build contract that was prepared by SPK. The design-build package included the final design plans for the mainline bridges (two (2) - 223’ single-span steel plate girder bridges), extension and/or repair of three (3) concrete box culverts, eight (8) overhead sign structures, and the approved Design Field View plans for the mainline and ramp reconstruction. The project also included water quality features in the in-fields that were coordinated and designed by the Center for Economic and Environmental Development (CEED) in cooperation with Allegheny College. The project was closely coordinated with the District who performed the Line & Grade Studies and was delivered in less than twelve (12) months. 

 

S.R. 4034 Section A60

Michael Kilgore

Cost: $26 million
Project Length: 6,005 Feet
Client: PennDOT Engineering District 1-0
Contact: Ms. Jeanette Uhl, P.E. 814-678-7084

This project included 6,005' of new highway construction with three structures and railroad relocation. The two structures designed by SPK included a single span (82.66' c/c brgs.) prestressed concrete spread box beam bridge over S.R. 0020 (Broad Street) and a two span (184.86' overall span) prestressed concrete spread box beam bridge over S.R. 4034 and the tracks of Norfolk Southern Railroad. The project also includes four signals, highway lighting, and landscaping of the new corridor.