S.R. 1009 Section F10
Michael Kilgore
Cost: $2.54 million
Client: PennDOT District 12-0
Contact: James Sisul, P.E. (jsisul@pa.gov)
Project Letting: April 30, 2020
S.R. 1009, Section F10 (ECMS #30687) - Washington County - This project was the replacement of a closed spandrel arch with a modular steel girder/precast concrete deck/precast abutments, wingwalls, and approach slabs. Due to the type and condition of the existing arch, and the critical nature of the roadway to the community, the project was advanced utilizing Accelerated Bridge Construction (ABC) methods. The new bridge, which includes deep pile foundations, was constructed within a 30 day road closure and detour. This method of construction minimized impacts to the traveling public and the community of Houston Borough.