S.R. 1012 Section B02
Michael Kilgore
Cost $2.94 million
Client: PennDOT District 1-0
Contact: Mr. Stephen Schettler (814-678-7356)
Project Letting - March 2017
Russell Bridge Replacement - This project included the replacement of the single span through-truss carrying S.R. 1012 over Conewango Creek with a two-span (219’-4” overall span) prestressed concrete bulb-tee bridge. The bridge detailing included a sidewalk with a precast concrete overlook at midspan. Portions of the original cut stone abutments were maintained and the architectural surface treatment pattern was specified to match the original stone. The project also included 970’ of approach roadway construction.