Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Prestressed Concrete Bulb Tee Bridge

S.R. 1012 Section B02

Michael Kilgore

After

After

After

Before

After

After

After

After

Cost $2.94 million
Client: PennDOT District 1-0
Contact: Mr. Stephen Schettler (814-678-7356)
Project Letting - March 2017

Russell Bridge Replacement - This project included the replacement of the single span through-truss carrying S.R. 1012 over Conewango Creek with a two-span (219’-4” overall span) prestressed concrete bulb-tee bridge. The bridge detailing included a sidewalk with a precast concrete overlook at midspan. Portions of the original cut stone abutments were maintained and the architectural surface treatment pattern was specified to match the original stone. The project also included 970’ of approach roadway construction.