S.R. 0403 Section 008
Michael Kilgore
Price: $4.13 million
Client: Engineering District 9-0
Contact: Kristen Swan (814-696-6840) or Alice Hammond (814-696-7172);
Project Letting 2012
Silk Memorial Bridge Replacement - This project included a two span (226.5’ overall) steel girder bridge to replace the existing deteriorated concrete closed-spandrel arch bridge over the Stoneycreek River. The bridge detailing included architectural surface treatments on the pier and barrier systems. The pedestrian barrier was also detailed to mimic the existing open baluster system complete with architectural lighting. Extensive coordination with area utilities and the USCOE was necessary to advance the project through utility clearance and environmental permitting respectively.