S.R. 0022 Section B02
Michael Kilgore
Cost: $44.0 million
Project Length: 4.316 miles
Client: PennDOT Engineering District 12-0
Contact: Mr. Patrick Richter, P.E. (724-430-4499)
Roadway Widening and Reconstruction - This project includes 4.316 miles of widening and
reconstruction of an arterial facility. The project also includes rehabilitation and extension of seven (7) arch structures.