S.R. 1054 Section F10/H10
Michael Kilgore
Cost: $1.275 Mil.
Client: PennDOT Engineering District 12-0
Project Letting - 2009
This project consisted of replacing two structures; the first a box culvert (14’ span) over an Un-named Tributary to Back Creek and the second, a bridge (45.5’ span) over Back Creek. The project included a combined 700’ of approach roadway reconstruction. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project.