S.R. 3043 Section 490
Michael Kilgore
Cost: $3.3 Million
Project Length: 0.82 Mile
Client: PennDOT Engineering District 10-0
(Rose Street) - Roadway on New Location - This project consisted of a 0.82 mile new facility on new location. Included were several side roads, a bike way, a box culvert, and two (2) traffic signals.